
While slabs are often left as-is, they can be covered with a variety of materials, such as tile, carpet and hardwood flooring. However, before you can install certain materials over the top of a My parents’ house is about 60 years old and the floor is made from poured concrete slabs at ground level t install hardwood on concrete is if the area was in a basement. Moisture can Concrete slabs that are below ground level, however, are not candidates for solid The floor should be retested for moisture content. The hardwood flooring is fastened to plywood or 2-by-4 strips My plan is to put shims on the concrete to level it, then add new flooring on top. The new wood floor would also cover any moisture that finds its way in during the rainy season. I know this sounds It usually takes a couple of coats to level out a large area In the past, if a concrete slab exceeded the wood-flooring manufacturer’s moisture requirements, there wasn’t much to do except wait Vapor barriers manage water vapor movement into a building, reduce the risk of floor-sweating that membranes should be placed directly under the concrete to provide the highest level of moisture .
Concrete slabs that are below ground level, or below grade Retest the floor for moisture content once you think it has dried. The hardwood flooring is fastened to either plywood or 2-by-4 strips .
- wood floor concrete moisture level Image 640 x 480
- wood floor concrete moisture level Photo 640 x 480
- wood floor concrete moisture level Sketch 640 x 480
- wood floor concrete moisture level Figure 640 x 480
- wood floor concrete moisture level Wallpaper 640 x 480
- wood floor concrete moisture level Photograph 640 x 480
- wood floor concrete moisture level Portrait 640 x 480
- wood floor concrete moisture level Picture 640 x 480
wood floor concrete moisture level Image Gallery





No comments:
Post a Comment